Double Pass RO

We have just completed an order for a 30m3/hr double pass RO.

The skid, assembled here on site, featured chemical dosing, intermediate tanks & CO2 removal membranes.

Pre-treatment consisted of 3 x 4872 Pyrolox filters with a frontal manifold system and 3" butterfly valves.

The control system was a Mitsubishi PLC with touch screen.